I have the 98 calendar installed and working. Is there a way to have the date show the 98 dates instead of the 96 dates?
Thanks
Rick
I have the 98 calendar installed and working. Is there a way to have the date show the 98 dates instead of the 96 dates?
Thanks
Rick