I got some new tracks for N1 and I wanted to add them in and rearrange
the calendar to be the same as the 1998 season.I got all the tracks i
needed and i changed the file to be the 1998 season..but when i started
a new season..it was never changed and i had the same season as
before.How can i make the calendar file and let me race on how I want
it??